News Detail

Momentum completes the installation of 7 pipelines in Turkmenistan

November, 2012

 

The pipelines installed in Turkmenistan are 6", 10", 12", 2 x 14", 18" and 20" and are in water depths ranging from 16m to 35m. Works are ongoing to complete the topside hook up and to commission the lines.
Click here for more images

 

    Copyright 1998 - 2013 Momentum Engineering. All rights reserved.     Sitemap | Privacy Policy