Offshore Platform Design Fabrication & Installation

Momentum offers turnkey service for the design, fabrication and installation of offshore platforms. Recent projects include:

  • A Turkmenistan platform weighing more than 1000 tons in 60 meters of water. The platform was installed in three sections: The first section weighing 400 tons was lifted and placed on the seabed using Momentum’s managed crane barge, the General Shikhlinsky.
  • Engineering, Procurement, Installation and Commissioning (EPIC) of a production platform in 43 meters of water in the Sea of Marmara  for TPAO. The jacket was comprised of a four-legged braced space frame structure supporting the topsides, riser and conductors. The design included a total of six well conductors, which were installed separately. The jacket was installed utilizing the derrick equipment of the jack up rig.
  • Engineering, Procurement, Installation and Commissioning (EPIC) of three tripod-shaped production platforms in water from 62m to 79m in the Black Sea for TPAO. Momentum innovations contributed substantially to meeting budgetary, logistical and scheduling concerns: First, our tripod design required less material and time to construct than a traditional four-legged structure. Second, all three platforms were locally fabricated onshore and then wet-towed to location for installation. The end result was the overall successful completion of the project.
 

Contact Person


Momentum Headquarters,
Al Mussalla Towers,
Suite 903,
Khalid Bin Waleed Street,
United Arab Emirates,
PO Box 62424, Dubai.
Phone: +9714-397-4115
Fax: +9714-397-4556
Send Mail
 

    Copyright 1998 - 2013 Momentum Engineering. All rights reserved.     Sitemap | Privacy Policy